The continuous minimum load of the molten salt system
The continuous minimum load will be between 10-20 MWe net (preliminary). Operation at lower loads is not expected to be continuous
The Plant shall start-up and shut down daily and pump tanks are envisaged to be empty and refilled every day.
上一条:Mode of operation and load changes 下一条:Product specifications for our molten salt pump