Basic requirements for pump installation
release time:2016/10/29 clicks:
Basic requirements for pump installation
1, in order to absorb shock and firmly fixed pump, pump foundation should have sufficient strength and size.
2, the basis of their own weight should be more than three times the weight of the pump group.
3, soft soil foundation treatment of occasions for stakes or concrete piles.
4, on the icy winter, the cold surface may reduce the bearing capacity of foundation, the foundation embedment depth than the depth of frozen soil depth.
5, based on the floor of the two floor, should pay attention to the center of the foundation and the center of the beam, or make it across the two beams, and as close as possible to the walls of the building.
6, based on the concrete casting about two weeks after the installation of pumps. Fully induration
7, between the pump frame and concrete foundation level correction should be left 10-30 mm gap, at the same time, the concrete foundation of above should not be with a trowel touch flat.
8, the anchor bolt hole of the square hole is big enough.
For more information about the installation of the pump, see www.hwpump.com
1, in order to absorb shock and firmly fixed pump, pump foundation should have sufficient strength and size.
2, the basis of their own weight should be more than three times the weight of the pump group.
3, soft soil foundation treatment of occasions for stakes or concrete piles.
4, on the icy winter, the cold surface may reduce the bearing capacity of foundation, the foundation embedment depth than the depth of frozen soil depth.
5, based on the floor of the two floor, should pay attention to the center of the foundation and the center of the beam, or make it across the two beams, and as close as possible to the walls of the building.
6, based on the concrete casting about two weeks after the installation of pumps. Fully induration
7, between the pump frame and concrete foundation level correction should be left 10-30 mm gap, at the same time, the concrete foundation of above should not be with a trowel touch flat.
8, the anchor bolt hole of the square hole is big enough.
For more information about the installation of the pump, see www.hwpump.com